INTERSTATE 295 WB over PA Canal

.5 MI.N.YARDLEY BO.33B09 · County 017, Pennsylvania · Built 2019 · 4 Lanes · 15,004 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
9
Excellent
Substructure
9
Excellent

Bridge Details

Structure #
000000000057066
Year Built
2019
Length
35.4 m (116.1 ft)
Max Span
34.4 m
Width
23.5 m (77.1 ft)
Lanes
4
Daily Traffic
15,004
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.