SR 4033 over PA TPK (I-76)

NEAR MURRYSVILLE · County 129, Pennsylvania · Built 2018 · 2 Lanes · 2,981 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000055966
Year Built
2018
Length
59.1 m (193.9 ft)
Max Span
29.3 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
2,981
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.