ALT 220 over SUNNYSIDE HOLLOW RUN

1 MI E PORT MATILDA · County 027, Pennsylvania · Built 2016 · 2 Lanes · 3,316 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000053312
Year Built
2016
Length
17.4 m (57.1 ft)
Max Span
16.5 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
3,316
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.