Ramp AB over PA TPK (I-76)

SR 29 Intercharge · County 029, Pennsylvania · Built 2012 · 2 Lanes · 2,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000047716
Year Built
2012
Length
103.9 m (340.9 ft)
Max Span
29.9 m
Width
19.3 m (63.3 ft)
Lanes
2
Daily Traffic
2,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.