RAMP A over 2nd ST FRONT & REANEY ST

COMM. BARRY BRDG 3806K07 · County 045, Pennsylvania · Built 2011 · 1 Lanes · 4,125 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000000045384
Year Built
2011
Length
414.5 m (1359.9 ft)
Max Span
59.4 m
Width
9.9 m (32.5 ft)
Lanes
1
Daily Traffic
4,125
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.