SR 80-I 80 over SR 879-PA 879

EXIT 120 CLEARFIELD INTER · County 033, Pennsylvania · Built 2004 · 2 Lanes · 12,800 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000042457
Year Built
2004
Length
29.9 m (98.1 ft)
Max Span
29.6 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
12,800
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.