SR 3006 PERRY HWY over SR 90 EB/WB

SPRINGFIELD TOWNSHIP · County 049, Pennsylvania · Built 2000 · 4 Lanes · 2,018 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000000040913
Year Built
2000
Length
47.2 m (154.9 ft)
Max Span
23.5 m
Width
22.5 m (73.8 ft)
Lanes
4
Daily Traffic
2,018
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$14,000
Total Project Cost
$188,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.