HOT METAL STREET over MON RIVER & PRIVATE RR

145 Hot Metal Bridge · County 003, Pennsylvania · Built 1904 · 2 Lanes · 17,500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000040785
Year Built
1904
Reconstructed
2000
Length
340.5 m (1117.1 ft)
Max Span
97.8 m
Width
8.4 m (27.6 ft)
Lanes
2
Daily Traffic
17,500
Material
Steel
Design
Truss - Thru
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$77,000
Total Project Cost
$1,037,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.