SR 86 W.B. over OVER FRENCH CREEK E.BR.

GREENFIELD TOWNSHIP · County 049, Pennsylvania · Built 1997 · 2 Lanes · 3,915 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000000039552
Year Built
1997
Length
50 m (164 ft)
Max Span
24.1 m
Width
13.3 m (43.6 ft)
Lanes
2
Daily Traffic
3,915
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$9,000
Total Project Cost
$117,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.