RAMP M & RAMP K over ORTHODOX PEARCE ARAMINGO
ARAMINGO INTER. 3481H10 · County 101, Pennsylvania · Built 1974 · 2 Lanes · 17,616 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
40.004719, -75.076536
This bridge is in worse condition than 53.2% of bridges in County 101. The average bridge in Pennsylvania is 0 years old; this one is 52 years old.
Nearby Bridges
SOUTHBOUND COLL.DI over OPEN GROUND(EARTH FILL)
Built 1975
RAMP A OFF RAMP over LEFEVRE ST. AND CONRAIL
Built 1966
INTERSTATE 95 over MARGARET STR.AND CONRAIL
Built 1966
RAMP D ON over MARGARET MILNOR ARAMINGO
Built 1968
INTERSTATE 95 over ORTHODOX-PEARCE STREET
Built 1966
RAMP J NORTHBOUND over ORTHODOX PEARCE STREETS
Built 1971
NORTHBOUND COLL.DI over OPEN GROUND(EARTH FILL)
Built 1975
RAMP X S.B.ON RAMP over EARTH FILL
Built 1975
RAMP B N.B. ON RAM over TACONY STREET
Built 1967
BRIDGE STREET over BRANCH FRANKFORD CREEK
Built 1970
Bridge Details
- Structure #
- 000000000039397
- Year Built
- 1974
- Length
- 163.7 m (537.1 ft)
- Max Span
- 42.7 m
- Width
- 16.2 m (53.1 ft)
- Lanes
- 2
- Daily Traffic
- 17,616
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $186,000
- Total Project Cost
- $2,516,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.