RAMP Y N.B. OFF over EARTH FILL

BESTY ROSS INTERCH3591G01 · County 101, Pennsylvania · Built 1975 · 1 Lanes · 17,685 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000039390
Year Built
1975
Length
331.9 m (1088.9 ft)
Max Span
22.9 m
Width
10.4 m (34.1 ft)
Lanes
1
Daily Traffic
17,685
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$141,000
Total Project Cost
$1,901,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.