RAMP D-DE S.B.OFF over FRONT STREET RAMP E-DE
WALT WHITMAN BRG.3700F05 · County 101, Pennsylvania · Built 1974 · 1 Lanes · 21,669 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
39.965406, -75.137289
This bridge is in worse condition than 53.2% of bridges in County 101. The average bridge in Pennsylvania is 0 years old; this one is 52 years old.
Nearby Bridges
RAMP NV over 2ND;3RD RMPS.N2V S3
Built 1989
INTERSTATE 95 N.B. over FRANKFORD AV & OTHER STS
Built 1977
INTERSTATE 95 S.B. over FRANKFD AV FRNKFRD EL.
Built 1977
INTERSTATE 95 N.B. over BROWN STREET
Built 1975
INTERSTATE 95 S.B. over BROWN STREET
Built 1975
RAMP NV SB TO VINE over BROWN STREET
Built 1975
I-95 over SHACKAMAXON STREET
Built 2019
INTERSTATE 95 N.B. over FAIRMOUNT AVENUE
Built 1975
INTERSTATE 95 S.B. over FAIRMOUNT AVENUE
Built 1975
RAMP NV S.B. OFF over FAIRMOUNT AVENUE
Built 1975
Bridge Details
- Structure #
- 000000000039316
- Year Built
- 1974
- Reconstructed
- 2010
- Length
- 362.4 m (1189 ft)
- Max Span
- 30.5 m
- Width
- 15.5 m (50.9 ft)
- Lanes
- 1
- Daily Traffic
- 21,669
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $105,000
- Total Project Cost
- $1,421,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.