BARTRAM AVE(NB)ON over SLUDGE LAGOONS

NORTH PLATT BRG. 3699E08 · County 101, Pennsylvania · Built 1985 · 1 Lanes · 13,073 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000000038714
Year Built
1985
Length
229.2 m (752 ft)
Max Span
28.3 m
Width
10.8 m (35.4 ft)
Lanes
1
Daily Traffic
13,073
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$30,000
Total Project Cost
$400,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.