SCHUYLKILL EXWY.EB over NEILL DRIVE

NR.CITY LINE AVE. 3479J09 · County 101, Pennsylvania · Built 1956 · 3 Lanes · 59,320 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000038445
Year Built
1956
Reconstructed
1972
Length
68.3 m (224.1 ft)
Max Span
23.5 m
Width
16.9 m (55.4 ft)
Lanes
3
Daily Traffic
59,320
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.