83 over 181 George St

EXIT-22 I-83 & PA 181 · County 133, Pennsylvania · Built 1957 · 4 Lanes · 57,639 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair

Bridge Details

Structure #
000000000037450
Year Built
1957
Reconstructed
1984
Length
68.9 m (226 ft)
Max Span
26.5 m
Width
21.9 m (71.9 ft)
Lanes
4
Daily Traffic
57,639
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$97,000
Total Project Cost
$1,304,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.