I-83; SR 0083 over MILL CREEK

0.8 MI S OF EXIT-19 I-83 · County 133, Pennsylvania · Built 1959 · 4 Lanes · 54,739 vehicles/day

Overall
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000037442
Year Built
1959
Length
22.3 m (73.2 ft)
Max Span
10.7 m
Width
31.1 m (102 ft)
Lanes
4
Daily Traffic
54,739
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$39,000
Total Project Cost
$531,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.