US 30; SR 0030 over GREENWOOD RD; T-825

1.8 MI NORTH OF LR126 · County 133, Pennsylvania · Built 1969 · 2 Lanes · 14,978 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000037361
Year Built
1969
Length
38.7 m (127 ft)
Max Span
15.8 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
14,978
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$48,000
Total Project Cost
$643,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.