PA TPK (RAMP 3&3A) over SR 0030

IRWIN INTERCHANGE · County 129, Pennsylvania · Built 1939 · 2 Lanes · 224 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000036822
Year Built
1939
Length
24.4 m (80.1 ft)
Max Span
21.9 m
Width
18.9 m (62 ft)
Lanes
2
Daily Traffic
224
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$45,000
Total Project Cost
$610,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.