BRIDGE PC29 over PIGEON CREEK trib

200 SOUTHWEST OF SR 2019 · County 125, Pennsylvania · Built 1942 · 2 Lanes · 150 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000000035336
Year Built
1942
Reconstructed
2014
Length
8.8 m (28.9 ft)
Max Span
8.2 m
Width
7.5 m (24.6 ft)
Lanes
2
Daily Traffic
150
Material
Prestressed Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$3,000
Total Project Cost
$35,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.