BRIDGE SC4 over SUGAR CREEK RUN TRIB.

1.1 MILES SOUTH OF TR 844 · County 125, Pennsylvania · Built 1966 · 2 Lanes · 150 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000035299
Year Built
1966
Reconstructed
2014
Length
12.5 m (41 ft)
Max Span
11.6 m
Width
7.5 m (24.6 ft)
Lanes
2
Daily Traffic
150
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$7,000
Total Project Cost
$99,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.