FIRST STREET over OVER MC GUIRE RUN

FIRST ST. TIDIOUTE BORO. · County 123, Pennsylvania · Built 1950 · 2 Lanes · 450 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
000000000034293
Year Built
1950
Reconstructed
2005
Length
7.3 m (24 ft)
Max Span
6.7 m
Width
6.4 m (21 ft)
Lanes
2
Daily Traffic
450
Material
Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$11,000
Total Project Cost
$153,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.