I-80 WB over OVER WHITE DEER CREEK

5 MI W OF WHITE DEER · County 119, Pennsylvania · Built 1970 · 2 Lanes · 10,338 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
000000000033431
Year Built
1970
Reconstructed
1994
Length
41.5 m (136.2 ft)
Max Span
16.2 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
10,338
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$15,000
Total Project Cost
$206,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.