SR 0015 over OVER MUTTON LANE CREEK
1 MI S TIOGA JUNCTION · County 117, Pennsylvania · Built 1942 · 2 Lanes · 3,465 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
41.951494, -77.105378
This bridge is in worse condition than 75.6% of bridges in County 117. The average bridge in Pennsylvania is 0 years old; this one is 84 years old.
Nearby Bridges
SR 15 NBL over UNNAMED TR TO TIOGA R.
Built 2008
SR 15 SB over UNNAMED TR. TO TIOGA RIV
Built 2008
T-773 CTY BDG #10 over TIOGA RIVER
Built 1993
SR 15 NBL over T-722
Built 2008
SR 15 SBL over T-722
Built 2008
SR 15 NBL over TIOGA RIVER AND RAILROAD
Built 2008
SR 15 SBL over TIOGA RIVER AND RAILROAD
Built 2008
T-787 LAWRENCE TWP over MUTTON LANE CREEK
Built 1974
US TR 15 over OVER MITCHELL CREEK
Built 1948
SR 15 NBL over old 15
Built 1992
Bridge Details
- Structure #
- 000000000032811
- Year Built
- 1942
- Length
- 14.6 m (47.9 ft)
- Max Span
- 14 m
- Width
- 12.6 m (41.3 ft)
- Lanes
- 2
- Daily Traffic
- 3,465
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $11,000
- Total Project Cost
- $153,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.