T811 SUHRIE HOL RD over RAYSTOWN BR.JUNIATA RIV.
3.5 MI.SW.NEW BALTIMORE · County 111, Pennsylvania · Built 1973 · 1 Lanes · 25 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
39.964603, -78.826564
This bridge is in worse condition than 59.1% of bridges in County 111. The average bridge in Pennsylvania is 0 years old; this one is 53 years old.
Nearby Bridges
PA TPK (I-76) WB over SR 1015
Built 1980
PA TPK (I76) EB over SR 1015; (LR55051)
Built 1980
Tunnel Rd Accs Rmp over Three Lick Run
Built 2023
PA TPK (I-76) over THREE LICK RUN
Built 1939
SR 1015 over RAYSTOWN BR JUNIATA RIV
Built 1962
SR 1017 over BREASTWORK RUN
Built 1937
PA TPK (I-76) over T-782
Built 1939
SR 1017 over BREASTWORK RUN
Built 1937
SR 1015 over RAYSTOWN BR JUNIATA RIV
Built 2022
PA TPK (I-76) over SR 0160 (LR 55045)
Built 1939
Bridge Details
- Structure #
- 000000000031835
- Year Built
- 1973
- Length
- 10.1 m (33.1 ft)
- Max Span
- 9.4 m
- Width
- 4.8 m (15.7 ft)
- Lanes
- 1
- Daily Traffic
- 25
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $48,000
- Total Project Cost
- $646,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.