PA TPK (I-76) over TRIB. TO STONY CREEK

WEST OF ALLEGHENY TUNNEL · County 111, Pennsylvania · Built 1939 · 4 Lanes · 29,452 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
000000000031823
Year Built
1939
Reconstructed
2004
Length
9.8 m (32.2 ft)
Max Span
6.7 m
Lanes
4
Daily Traffic
29,452
Material
Concrete
Design
Culvert
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$80,000
Total Project Cost
$1,085,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.