US 219 NBL over PA 403

OVER PA 403 · County 111, Pennsylvania · Built 1969 · 3 Lanes · 7,419 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000031424
Year Built
1969
Reconstructed
2011
Length
58.2 m (190.9 ft)
Max Span
30.2 m
Width
15.4 m (50.5 ft)
Lanes
3
Daily Traffic
7,419
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$403,000
Total Project Cost
$4,940,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.