6TH MUL PINE STS over CARBON RUN

SIXTH STREET BRIDGE · County 097, Pennsylvania · Built 1995 · 2 Lanes · 1,105 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
000000000029394
Year Built
1995
Length
7 m (23 ft)
Max Span
7 m
Width
17.7 m (58.1 ft)
Lanes
2
Daily Traffic
1,105
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$60,000
Total Project Cost
$567,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.