SR 3018 over OVER MAHANTANGO CREEK

6.25 MI E OF PILLOW · County 097, Pennsylvania · Built 1941 · 2 Lanes · 819 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000029259
Year Built
1941
Reconstructed
1981
Length
32.3 m (106 ft)
Max Span
31.4 m
Width
8.6 m (28.2 ft)
Lanes
2
Daily Traffic
819
Material
Steel
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$12,000
Total Project Cost
$156,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.