I-80 WB over OVER S.R. 3013

MONTOUR-NORTHD CO. LINE · County 093, Pennsylvania · Built 1962 · 2 Lanes · 13,626 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000028338
Year Built
1962
Reconstructed
1996
Length
32.9 m (107.9 ft)
Max Span
12.8 m
Width
13.9 m (45.6 ft)
Lanes
2
Daily Traffic
13,626
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$77,000
Total Project Cost
$1,036,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.