CONRAD DRIVE-RAMPS over PULASKI DRIVE
AT PULASKI DRIVE 3366-F7 · County 091, Pennsylvania · Built 1962 · 3 Lanes · 5,170 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
40.087203, -75.399558
This bridge is in worse condition than 62.9% of bridges in County 091. The average bridge in Pennsylvania is 0 years old; this one is 64 years old.
Nearby Bridges
SCHUYLKILL EXPWAY. over NORTH GULPH ROAD
Built 1985
RAMP A-1 3366G07 over RAMP B
Built 2003
RAMP D-2 over SCHUYLKILL EXPWY;RAMP D
Built 2002
RAMP E over RAMP B / 3366-H7
Built 2003
DEKALB PIKE over SCHUYLKILL EXPRESSWAY
Built 1950
RAMP D-2 TO RT 422 over RAMP B ( WB I76)/3366-H7
Built 2003
RAMP B over SCHUYLKILL EXPWY RAMP D
Built 2002
SOUTH WARNER ROAD over US RTE 202;RMPS F1 AND S
Built 2001
Goddard Blvd. over TPK Toll Ramps
Built 2003
RAMP I over RAMP D / 3366-H7
Built 2003
Bridge Details
- Structure #
- 000000000028127
- Year Built
- 1962
- Length
- 10.1 m (33.1 ft)
- Max Span
- 9.1 m
- Width
- 17.7 m (58.1 ft)
- Lanes
- 3
- Daily Traffic
- 5,170
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $21,000
- Total Project Cost
- $284,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.