PA TPK (I-76) over I-76 RAMPS AB

VALLEY FORGE INTERCHANGE · County 091, Pennsylvania · Built 2008 · 5 Lanes · 65,138 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000028004
Year Built
2008
Length
39.3 m (128.9 ft)
Max Span
38.4 m
Width
42.5 m (139.4 ft)
Lanes
5
Daily Traffic
65,138
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Toll Authority
Last Inspected
N/A
Est. Improvement
$151,000
Total Project Cost
$2,043,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.