NEW SECOND STREET over BRANCH TACONY CREEK

CHELTENHAM 3371B10 · County 091, Pennsylvania · Built 1938 · 2 Lanes · 6,088 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000000027680
Year Built
1938
Length
7.9 m (25.9 ft)
Max Span
7.3 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
6,088
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$17,000
Total Project Cost
$224,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.