MID-COUNTY EXWY.NB over SCHUYLKILL R RDS NSRC

W. CONSHOHOCKEN 3367J08 · County 091, Pennsylvania · Built 1974 · 3 Lanes · 57,500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000027473
Year Built
1974
Reconstructed
2011
Length
591.9 m (1941.9 ft)
Max Span
57.6 m
Width
17.1 m (56.1 ft)
Lanes
3
Daily Traffic
57,500
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$992,000
Total Project Cost
$13,393,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.