SR 3030 BUDD ST over OVER SHENANGO RIVER

CITY OF SHARON · County 085, Pennsylvania · Built 1965 · 2 Lanes · 3,501 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000026019
Year Built
1965
Reconstructed
1999
Length
56.4 m (185 ft)
Max Span
28 m
Width
14.8 m (48.6 ft)
Lanes
2
Daily Traffic
3,501
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$22,000
Total Project Cost
$302,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.