SR 3011 BETHEL RD over SR 80 EB & WB

SHENANGO TOWNSHIP · County 085, Pennsylvania · Built 1965 · 2 Lanes · 1,072 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000000025992
Year Built
1965
Length
69.8 m (229 ft)
Max Span
17.1 m
Width
10.2 m (33.5 ft)
Lanes
2
Daily Traffic
1,072
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$73,000
Total Project Cost
$987,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.