SR 79 SB over OVER SR2014 B&LE MILL CR

FINDLEY TOWNSHIP · County 085, Pennsylvania · Built 1966 · 2 Lanes · 8,539 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000025745
Year Built
1966
Reconstructed
1988
Length
140.2 m (460 ft)
Max Span
39 m
Width
11.4 m (37.4 ft)
Lanes
2
Daily Traffic
8,539
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$54,000
Total Project Cost
$726,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.