T-416 over ALLEGHENY RIVER

TURTLEPOINT · County 083, Pennsylvania · Built 1963 · 2 Lanes · 452 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000025474
Year Built
1963
Reconstructed
2014
Length
61 m (200.1 ft)
Max Span
22.9 m
Width
9.6 m (31.5 ft)
Lanes
2
Daily Traffic
452
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$43,000
Total Project Cost
$577,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.