I-81 NB over NESCOPECK CREEK

BUTLER TWP .5 M S SR 3040 · County 079, Pennsylvania · Built 1965 · 2 Lanes · 14,586 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000000023690
Year Built
1965
Reconstructed
1993
Length
124.4 m (408.1 ft)
Max Span
24.7 m
Width
11.4 m (37.4 ft)
Lanes
2
Daily Traffic
14,586
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$109,000
Total Project Cost
$1,474,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.