I-80 EB over LINESVILLE CREEK

WHITE HAVN BO .5M W TR940 · County 079, Pennsylvania · Built 1966 · 2 Lanes · 10,822 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
5
Fair
Substructure
4
Poor

Bridge Details

Structure #
000000000023677
Year Built
1966
Reconstructed
1983
Length
8.2 m (26.9 ft)
Max Span
7.9 m
Width
13.9 m (45.6 ft)
Lanes
2
Daily Traffic
10,822
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$13,000
Total Project Cost
$173,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.