I-80 EB over HONEY HOLE & NESCOPECK

BUTLER TWP 1.6 M E TR 309 · County 079, Pennsylvania · Built 1966 · 2 Lanes · 10,822 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000000023669
Year Built
1966
Reconstructed
1989
Length
56.4 m (185 ft)
Max Span
21.9 m
Width
11.4 m (37.4 ft)
Lanes
2
Daily Traffic
10,822
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$59,000
Total Project Cost
$801,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.