SR 0029 TR 29 over CEASETOWN DAM OUTLET

PLYMOUTH TWP .3M N SR1059 · County 079, Pennsylvania · Built 1932 · 2 Lanes · 1,669 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000023632
Year Built
1932
Length
8.2 m (26.9 ft)
Max Span
7.6 m
Width
10 m (32.8 ft)
Lanes
2
Daily Traffic
1,669
Material
Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$14,000
Total Project Cost
$190,000