SR 0029 TR 29 over SUSQUEHANNA RIVER & R.R.

HANOVER TWP JCT TR 11 · County 079, Pennsylvania · Built 1957 · 2 Lanes · 12,805 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000023626
Year Built
1957
Reconstructed
2009
Length
837.9 m (2749 ft)
Max Span
54.6 m
Width
19.3 m (63.3 ft)
Lanes
2
Daily Traffic
12,805
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,242,000
Total Project Cost
$16,770,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.