I-376 WB over 8008 RP.E & SHENANGO RIV

376WB O/ RP E SHENANGO R · County 073, Pennsylvania · Built 1975 · 2 Lanes · 7,259 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000022194
Year Built
1975
Reconstructed
2013
Length
193.2 m (633.9 ft)
Max Span
55.2 m
Width
14.5 m (47.6 ft)
Lanes
2
Daily Traffic
7,259
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$221,000
Total Project Cost
$2,980,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.