S POPLAR ST over CONOY CREEK

1200 FT SE OF SR 241 · County 071, Pennsylvania · Built 1950 · 2 Lanes · 1,550 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000000022150
Year Built
1950
Length
9.4 m (30.8 ft)
Max Span
9.1 m
Width
12.4 m (40.7 ft)
Lanes
2
Daily Traffic
1,550
Material
Concrete
Design
Tee Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$39,000
Total Project Cost
$524,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.