SR 2030 over PEQUEA CREEK

LIME VALLEY · County 071, Pennsylvania · Built 1927 · 2 Lanes · 441 vehicles/day

Overall
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000021574
Year Built
1927
Reconstructed
2023
Length
39.9 m (130.9 ft)
Max Span
18.9 m
Width
7.7 m (25.3 ft)
Lanes
2
Daily Traffic
441
Material
Concrete
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$101,000
Total Project Cost
$1,361,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.