PA 283 EB; SR 0300 over SR 4033 MILTON GROVE RD.

2 MI.N. MT. JOY BORO · County 071, Pennsylvania · Built 1968 · 2 Lanes · 24,666 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
000000000021177
Year Built
1968
Length
35.1 m (115.2 ft)
Max Span
11.9 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
24,666
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$86,000
Total Project Cost
$1,163,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.