US 222 NB; SR 0222 over US 30; SR 0030

U.S. 222 N.B. OVER US 30 · County 071, Pennsylvania · Built 1969 · 1 Lanes · 34,043 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
000000000021078
Year Built
1969
Reconstructed
2004
Length
54.9 m (180.1 ft)
Max Span
35.4 m
Width
10.4 m (34.1 ft)
Lanes
1
Daily Traffic
34,043
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$51,000
Total Project Cost
$693,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.