SR 0502 TR 502 over SPRING BROOK

MOOSIC BORO .3 M E TR 11 · County 069, Pennsylvania · Built 1958 · 2 Lanes · 5,285 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000020636
Year Built
1958
Reconstructed
2010
Length
42.1 m (138.1 ft)
Max Span
20.1 m
Width
15 m (49.2 ft)
Lanes
2
Daily Traffic
5,285
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$69,000
Total Project Cost
$926,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.