SR 0006 TR 6 & 11 over OUTLET OF GLENBURN POND

GLENBURN TWP .2M W SR4010 · County 069, Pennsylvania · Built 1952 · 2 Lanes · 11,147 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000020366
Year Built
1952
Reconstructed
2016
Length
17.1 m (56.1 ft)
Max Span
15.8 m
Width
27.1 m (88.9 ft)
Lanes
2
Daily Traffic
11,147
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$32,000
Total Project Cost
$437,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.