T-360 Peterson Rd over BLACKLOG CREEK

2 MI.SE.OF ORBISONIA · County 061, Pennsylvania · Built 1930 · 1 Lanes · 5 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
000000000018911
Year Built
1930
Reconstructed
1991
Length
13.4 m (44 ft)
Max Span
12.5 m
Width
4.3 m (14.1 ft)
Lanes
1
Daily Traffic
5
Material
Steel
Design
Girder and Floorbeam System
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$56,000
Total Project Cost
$757,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.